Day 3 of 4 · 6 hours · Level 2 Intermediate

Participation, risks and exit

Learning objectives for today
  • Organise representative governance and complaints mechanisms.
  • Prevent and manage fire, flood and eviction risks.
  • Prepare site closure and durable solutions, including out of camps.

1Governance and residents' participation

Residents are not passive beneficiaries: they are the ones who know the site's problems. Governance is organised through representative structures: central committee, block leaders, sector committees (water, health, security, complaints), groups of women, young people and persons with disabilities.

  • Equitable representation of women (the aim is parity on committees) and of minority groups.
  • Selection by election or consensus, limited terms, written terms of reference, signed code of conduct.
  • Vigilance against committee capture by self-appointed leaders or armed groups.

The site manager trains committees, checks that information flows both ways and also consults less visible groups directly, for example in separate focus group discussions.

2Complaints, feedback and communication

A complaints and feedback mechanism (CFM) must be accessible to everyone: suggestion boxes, help desks at the site office, a toll-free hotline, mobile staff, committees. It must be known, confidential, safe and suited to people who cannot read.

Each piece of feedback is recorded, referred to the right service provider and followed up until a response is given to the person: this is the feedback loop. Sensitive complaints (sexual exploitation and abuse, fraud, abuse of power) follow a separate confidential channel to PSEA focal points and specialised services, never public posting. Trends are analysed and shared back with residents.

3Reducing risks: fire, flood, eviction

A site concentrates risks. The site manager maps them with residents and prepares a preparedness and response plan:

  • Fire: clear firebreaks, distance between shelters, fuel-efficient stoves, water or sand points, trained fire watch committees, evacuation plan.
  • Flood: drainage maintained before the rainy season, relocation of shelters in low-lying areas, raised latrines, stocks of materials.
  • Eviction: written land agreements, dialogue with landowners and authorities, monitoring of threats, advocacy. A forced eviction without consultation, notice or alternative is contrary to international law.

Other risks are monitored continuously: epidemics, tensions with the host community, gender-based violence, presence of weapons.

4Out of camps, closure and durable solutions

When displaced people are dispersed, out-of-camp approaches are adopted: mobile site management (a team covers several small sites with regular visits and local committees) and area-based approaches, which organise coordination across a neighbourhood or locality, for displaced people and the host population alike.

The closure of a site is prepared with residents: intentions survey, information on return areas, transport support, handover or dismantling of infrastructure, rehabilitation of the land. The IASC framework recognises three durable solutions: return, local integration and settlement elsewhere in the country. A solution is durable when the person no longer has specific needs linked to their displacement and enjoys their rights without discrimination. The choice must be free, informed and voluntary.

In-depth course

Detailed methods, a complete worked example, tools, common mistakes and interview questions.

5Setting up representative governance: the method

Site governance structures are often set up in a rush, with the first leaders who come forward. Three months later, the team discovers that the central committee speaks on behalf of everyone but represents only one clan, that women sit on it only on paper, and that distribution lists have become a source of income. Fixing this costs far more than getting it right at the start. The Minimum Standards for Camp Management call for structures that are representative, inclusive, known to residents and accountable to them.

Step 1: map existing power (weeks 1 to 3)

  • Who are the traditional, religious and administrative leaders (chiefs of villages of origin), the youth and women leaders, the influential traders?
  • Which communities of origin, which languages, which tensions?
  • Who controls what today: lists, access to land, water, distributions?
  • Who is never visible: single women, persons with disabilities, minorities, new arrivals, older persons?

Method: individual interviews, focus group discussions separated by sex and age, observation of distributions and meetings. The results remain internal: a power map that is shared carelessly can put people in danger.

Step 2: define the rules with residents (weeks 3 to 6)

A model is not parachuted in. The site manager proposes non-negotiable principles (equitable representation of women, inclusion of minority groups and persons with disabilities, limited terms of office, no links with armed groups, a code of conduct, a ban on any form of payment or favour in exchange for access to assistance) and discusses the rest with residents: number of representatives per block, selection method, length of term, role of traditional leaders.

Step 3: organise the selection

  1. All residents informed, in all languages, at least two weeks in advance.
  2. Open candidacies, with specific support for women candidates (separate information sessions, childcare during meetings).
  3. Selection by block: secret ballot or queue voting, or consensus verified in separate assemblies of men and women. The basic principle to guarantee parity: one seat reserved for a woman and one for a man in each block.
  4. Observation by the team and, where possible, by the local authorities; results posted and announced.
  5. An appeal period of a few days, handled by a joint commission.

Step 4: formalise and train

Contents of a committee's terms of referenceExample
Mandate and roleRepresent the block's residents, relay information in both directions, report gaps, take part in the site meeting
CompositionTwo representatives per block (one woman, one man), one representative of persons with disabilities and one of youth on the central committee
Term of officeOne year, renewable once
What the committee does not doDraw up distribution lists on its own, sanction residents, handle sensitive complaints, collect money
FunctioningMonthly meeting with minutes, quorum, decisions by consensus or majority
AccountabilityQuarterly block assembly, possibility of removal from office under a written procedure
Code of conductImpartiality, confidentiality, prohibition of sexual exploitation and abuse, disclosure of conflicts of interest
SupportInitial training, materials, meeting space; any allowances aligned with the cluster's rules

The initial training (two to three days) covers: the role of the site management agency and of service providers, service standards, humanitarian principles, code of conduct and PSEA, referral of sensitive cases, meeting facilitation and conflict management.

Step 5: check and correct continuously

  • Do the elected women speak up, and are their proposals taken up? Observe, and organise separate consultations.
  • Do residents know their representatives? A simple question in the quarterly survey is enough.
  • Are complaints against committee members dealt with? Their number and follow-up are an indicator of the health of governance.

Compensating committee members is a sensitive issue: without support, only the better-off can devote time to the committee; with high allowances, the position becomes a power stake. The rule is to follow the cluster's guidance, to stay modest, and to pay for specific tasks rather than titles.

6The site complaints and feedback mechanism: design and operation

The Core Humanitarian Standard (CHS) requires that affected people participate in the decisions that concern them (Commitment 4) and have access to safe and responsive mechanisms to handle their complaints (Commitment 5). The IASC commitments on accountability to affected people and protection from sexual exploitation and abuse point in the same direction. At site level, the site management agency is often the common entry point for feedback concerning all service providers.

Designing the mechanism with residents

  1. Consult by group (women, men, youth, older persons, persons with disabilities, minorities): how do they prefer to report a problem? Whom do they trust? What prevents them from complaining (fear of losing assistance, illiteracy, distance)?
  2. Choose several complementary channels: information desk at the site office, mobile staff in the blocks, toll-free hotline (often shared by several organisations), locked boxes opened by two people, committees, separate listening sessions.
  3. Set categories and timeframes: acknowledgement of receipt, response time, escalation route.
  4. Define the pathways: who receives, who handles, who responds, who checks closure.
  5. Raise awareness of the mechanism: repeated messages, illustrated posters, radio, sessions in the blocks.

Categories and handling times (example)

CategoryExamplesPathwayIndicative response time
1. Request for informationDistribution date, school openingImmediate response by the staff member or the deskImmediate to 3 days
2. Feedback or suggestionDistribution times, location of water pointsForwarded to the relevant service provider, analysed at the meeting2 weeks
3. Complaint about a serviceBroken tap, incomplete ration, shelter not repairedForwarded to the service provider with a request for a response; followed up by the site manager1 to 2 weeks
4. Complaint about exclusion or targetingHousehold missing from the listsVerification by the service provider and the site manager, bypassing the committee concerned if it is implicated2 weeks
5. Sensitive complaintSexual exploitation or abuse, fraud, corruption, staff behaviourConfidential pathway: immediate transmission to the PSEA focal point or to the investigation unit of the organisation concerned; support to the survivor through specialised servicesTransmission within 24 hours
6. Protection or security emergencyDeath threat, child at risk, ongoing violenceImmediate referral according to the referral pathwayImmediate

The feedback register

Minimum fields: unique number, date, channel, block, sex and age group of the person (if they agree to give them), category, summary description, organisation concerned, date forwarded, response provided, date of response to the person, the person's satisfaction, closure date. Category 5 complaints do not appear in this shared register: only a number and the note "forwarded under the confidential procedure" appear there; the details are kept by the authorised focal point.

Closing the loop

  • Every person who lodged a named complaint receives an individual response, even a negative one ("the ration cannot be increased because...").
  • Anonymous complaints receive a collective response: notice boards, block meetings, radio.
  • Every month, the trend analysis is presented at the site meeting and to the committees; every quarter, a public feedback session explains what has changed thanks to the feedback received.

A mechanism that receives very few complaints is not a sign of satisfaction: it is often a sign that people do not know about it, do not trust it or are afraid of it. Volume, the diversity of the people who use it and the response rate are the real indicators.

7Analysing and managing site risks: from mapping to contingency planning

A site concentrates thousands of people in a small space, with flammable materials, shared sanitation facilities and an already vulnerable population. The Minimum Standards require the site management agency to contribute to a safe environment, which involves a risk analysis conducted with residents and updated at least before each high-risk season.

Step 1: identify the hazards

Through a transect walk of the site with the committees, separate focus group discussions and a participatory map, the team identifies: flood-prone areas and points where water accumulates, excessive densities, cooking fires, fuel storage, makeshift electrical installations, dark or isolated areas, poorly located latrines, flashpoints with the host community, places where armed men gather.

Step 2: assess and prioritise

RiskLikelihood (1 to 5)Impact (1 to 5)ScoreMitigation measures
Flooding of low-lying blocks in the rainy season5420Clearing of drains, relocation of shelters located in low points, raising of latrines
Shelter fires4416Cleared firebreaks, improved stoves, communal or sheltered kitchens, water and sand points, fire watch committees
Cholera outbreak3515Chlorination, hygiene promotion, isolation plan with the health partner, prepositioning of supplies
Assaults at night near latrines4416Lighting, relocation of latrines, community patrols, safety audit
Tensions with neighbouring herders339Joint committee, agreement on a livestock corridor, shared services

Fire prevention: the standard set-up

  • Respect for distances: at least 2 m between shelters (ideally twice their height), 30 m firebreaks every 300 m, checked every month.
  • Water points or drums of water and sand, fire beaters, distributed by community; monthly checks.
  • Fire watch committees trained in each block, with an alarm signal known to all (whistle, bell).
  • Awareness-raising: cooking outdoors or in sheltered kitchens, supervision of fires, ban on candles in plastic-sheeting shelters, caution with electrical connections.
  • Coordination with local fire services where they exist: vehicle access via the main roads.

Responding to a serious incident: the example of a fire

TimeframeSite manager's actions
Hours 0 to 6Safety of people and of the team; support to evacuation and firefighting by the committees; informing the authorities and the cluster; initial temporary accommodation (communal space, volunteer neighbouring families); identification of the injured and of separated persons
Hours 6 to 24Listing of affected households (shelters destroyed, damaged, belongings lost), with priority for persons with specific needs; quantified alert to the Shelter and NFI, Protection, Health and WASH clusters
Days 2 to 3Coordination of the response: emergency items, water, meals; listening to households; preventing tensions (accusations, search for culprits); regular information to residents
Weeks 1 to 4Analysis of the causes with the committees; reconstruction according to the site plan (and not identically if distances were not respected); revision of the prevention plan; lessons learned shared with the cluster

The site contingency plan

It runs to a few pages: scenarios (influx of new arrivals, flooding, fire, epidemic, attack or armed threat, eviction), trigger thresholds, roles of each actor, prepositioned stocks, contacts, the procedure for communicating with residents and for suspending or resuming activities. It is tested through a simulation exercise at least once a year.

Safety audits conducted with groups of women and girls (walks through the site by day and by night, maps of areas perceived as dangerous) are the most effective tool for reducing the risks of gender-based violence linked to site layout, in line with the IASC Guidelines for Integrating Gender-Based Violence Interventions in Humanitarian Action.

8Worked example: the Ngara site before the rainy season

Fictional context: the Ngara site, on an alluvial plain in the province of Lac-Sombé, hosts 9,800 people (about 1,960 households) spread over 8 blocks. Last year, 300 shelters were flooded in August, and two dry-season fires destroyed 45 shelters. The central committee has 15 members, 2 of them women, all from the two majority communities of origin. The rainy season starts in 10 weeks. The site management agency, the fictional NGO "Horizons Partagés", has a risk mitigation budget of USD 38,000.

1. Risk analysis conducted with residents

A walk through the site with the block committees and four focus group discussions (women, men, youth, older persons and persons with disabilities) produce the risk map. Findings: blocks 6, 7 and 8 are in the low-lying part; the main drain is blocked over 600 m; 210 shelters in blocks 7 and 8 are in areas that flooded last year; both fires started in indoor kitchens in block 3, where shelters are less than 1 m apart; women in block 8 avoid the latrines at night because there is no lighting.

2. The 10-week action plan

WeekActionResponsibleEstimated cost (USD)
1 to 2Informing residents about the plan; individual identification of the 210 households in the flood-prone area; consultation on the options (plots in the expansion area to the north, raising of shelters)Site management agency, block committees500
2 to 5Clearing of 600 m of main drain and 2.4 km of secondary drains through paid activities (120 participants, 15 days, rotation)Site management agency, maintenance committee14,400 (120 × 15 × USD 8, cluster rate)
3 to 7Voluntary relocation of 140 households to the expansion area (materials, transport, reconstruction support); raising of shelters for 70 households who prefer to staySite management agency, Shelter partnerMaterials covered by the Shelter partner; transport and labour 9,800
3 to 6Raising or relocation of 24 latrines in the low-lying areaWASH partnerWASH budget
4 to 6Clearing of the firebreaks in block 3; installation of 40 water and sand drums; training of 8 fire watch committees (one per block)Site management agency6,200
5 to 8Repair and addition of 30 solar lamps (priority to blocks 7 and 8); night-time safety audit with women's groupsSite management agency, protection partner5,400
8 to 9Prepositioning: 300 tarpaulins, tools, sandbags; identification of a temporary accommodation space (sector school on higher ground); flood simulation exerciseSite management agency, Shelter Cluster1,700 (excluding cluster stocks)
OngoingKey messages disseminated through committees, radio and mobile staff: early warning, evacuation, water chlorinationSite management agency, WASH partnerIncluded
Total on the site management agency's budget38,000

3. Strengthening the representation of women and minorities

The current committee (13 men, 2 women) was appointed by the customary chiefs when the site opened. Rather than dissolving it, which would trigger conflict at the worst possible time, the agency proposes a transition timetable validated at a general assembly:

  • Immediately: creation of a women's committee consulted on the rainy season plan; two representatives of this committee invited to sit on the central committee.
  • In three months, after the critical period: new selections by block under the rule of one seat for a woman and one for a man per block (16 seats), plus three seats for persons with disabilities, youth and older persons, i.e. a committee of 19 members with at least 8 women.
  • Minority communities, present mainly in blocks 5 and 8, are guaranteed representation through selection by block; a specific dialogue is held with their leaders to encourage candidacies.
  • The customary chiefs retain a recognised advisory role, which reduces resistance.

4. The quarterly feedback analysis

CategoryNumberShareResponse within timeframeInterpretation
Requests for information14635%96%Distributions are poorly announced: messages to be revised
Water and sanitation9824%71%Concentrated in blocks 6 to 8: consistent with the risk map
Shelter6115%64%Waiting for repair materials; escalated to the Shelter Cluster
Exclusion from lists5213%58%Several complaints implicate the same block leader: independent verification under way
Safety and security389%ReferredDark areas in block 8
Sensitive complaints (confidential pathway)41%Forwarded within 24 hVolume probably underestimated: strengthen information on this pathway among women
Other133%85%—
Total412100%78% (excluding sensitive and security)

The overall rate of responses within the timeframe (78%) is just below the 80% threshold set by the agency. The weakness lies in exclusion complaints: they require door-to-door verification and touch on governance. This finding reinforces the decision to reconstitute the central committee.

What the example shows: risk analysis, governance and complaints are not three separate activities. The same blocks, the same groups and the same failures appear in all three. An effective site manager cross-checks sources before deciding.

9Out of camp: mobile site management, area-based approaches and collective centres

In most crises, the majority of displaced people live outside camps: with host families, in rented accommodation, in small informal sites or in collective centres. The CCCM cluster has developed approaches to provide them with site management functions (information, participation, coordination, service monitoring) without creating a camp.

Mobile site management: setting up the system

  1. Map small sites and areas of concentration with the DTM and the authorities: population, land tenure status, services present, accessibility.
  2. Group sites into realistic circuits according to distance and security.
  3. Size the teams: for example, a mobile team of four (a team leader, two mobilisers including one woman, a monitoring officer) can cover about ten small sites with a visit every 10 to 15 days, depending on distances.
  4. Appoint focal points in each site (one woman and one man), trained to pass on information and to report gaps and emergencies between visits.
  5. Use light tools: a one-page monitoring form, a messaging group or phone line for focal points, a multi-site dashboard.
  6. Coordinate by area: a monthly meeting per area rather than per site, with service providers and local authorities.

Area-based approaches

An area-based (or settlement-based) approach defines a geographical unit (neighbourhood, municipality, group of villages) and organises coordination for its entire population, displaced or not, in close liaison with the local authorities. The site management agency often runs a community centre or information centre there: referral to services, recording of feedback, community activities, legal aid sessions. The benefits are reduced tensions with hosts, support to existing public services and a natural groundwork for durable solutions.

Collective centres

The UNHCR and IOM Collective Centre Guidelines (2010) recall that a collective centre must be a temporary last resort and that its closure must be prepared from the day it opens. Points of attention:

  • Privacy and protection: partitioning by family, separate spaces for single persons, sex-segregated and lockable sanitation facilities.
  • Fire and structural safety: clear emergency exits, fire extinguishers, ban on stoves in rooms, structural assessment by an engineer.
  • Density: number of people per room and surface area per person monitored as on a site.
  • Competing use: an occupied school deprives children of schooling; a timetable for vacating it is negotiated with the education sector, the authorities and the families.
  • Agreement with the owner: duration, compensation, inventory of condition, rehabilitation.

Preparing closure from now on

Closure will be covered in depth on day 4. From the care and maintenance phase onwards, the site manager lays the groundwork: questions on intentions in every profiling exercise, documented baseline condition of the land, infrastructure designed to be handed over to the host community, early links with housing, livelihoods and civil documentation actors.

10Variations, common mistakes and the donor's perspective

Adapting participation and risk management to the context

ContextPoint of attentionAdaptation
Acute phaseNo time for electionsInterim representatives designated publicly, with one woman and one man per block, and an announced date for formal selections
Site controlled by a de facto authority or an armed groupCapture of committees, risks for membersRisk analysis before any election, discretion about members' identities, multiple direct channels with residents, consultation of the Protection Cluster
Highly hierarchical societiesResistance to the participation of women and youthSeparate women's committees with a real mandate, dialogue with religious and customary leaders, step-by-step progress
Remote managementComplaints not handled, committees without supportShared toll-free hotline, systematic call-backs to callers, remote support to committees, occasional verification visits
Recurrent disaster (cyclones, floods)The same site is hit every yearSeasonal plan built into the calendar, community-based early warning systems, links with civil protection

Common mistakes

  • Women appointed but without real power: token seats, meetings held in the evening. Check effective participation, not just attendance.
  • Complaints mechanism run by the committees: complaints against the committees never come through. There must always be at least one direct and independent channel.
  • Sensitive complaints handled like ordinary complaints: recorded in the shared spreadsheet, discussed at meetings. This is a serious failure that puts the survivor at risk.
  • Risk plan written in the office without a site walk or consultation, which ignores the dangerous areas known to residents.
  • Rebuilding identically after a fire, recreating the densities that allowed it to spread.
  • Forgetting small sites in favour of the visible large camp, even though needs there are often more severe.

What donors and evaluators look at

  • The composition of governance structures (share of women, inclusion of persons with disabilities and minorities) and how they actually function.
  • How the complaints mechanism works: volume, diversity of users, timeframes, response rate, examples of changes achieved.
  • The existence of a PSEA procedure known to residents and staff, and of a confidential pathway.
  • Evidence of seasonal preparedness: plan, budget, implementation before the season, lessons learned afterwards.
  • Coverage of out-of-camp displaced populations where the project provides for it, with dedicated indicators.

11Interview questions and key references

Interview questions

1. "You discover that the central committee is selling places on the distribution lists. What do you do?"

A good answer first protects the people who reported the facts (confidentiality), verifies the information independently, informs the distribution service provider and the cluster focal point, organises a verification of the lists that bypasses the committee, and initiates a review of governance in line with the terms of reference (removal procedure). It avoids public humiliation, which would create violent conflict.

2. "How do you ensure that women genuinely participate in the governance of a site?"

It cites seats reserved per block, suitable times and venues, childcare, training, women's committees with a real mandate, separate consultations, and monitoring of their actual influence on decisions.

3. "A complaint of sexual exploitation against a partner's employee comes in via the hotline."

It describes the survivor-centred approach: listening, safety, information on services, referral to assistance with consent, confidential transmission within 24 hours to the PSEA focal point or the inter-agency mechanism, no personal investigation, no sharing at meetings.

4. "What is your priority ten weeks before the rainy season?"

It proposes a participatory risk analysis, clearing of drainage, voluntary relocation of shelters in low-lying areas, prepositioning, early warning messages and a simulation exercise, with a timetable and a budget.

5. "How do you manage 25 small, scattered sites with a single team?"

It explains mobile site management: mapping, circuits, visit frequency, trained focal points, light tools, area-based coordination, prioritisation according to vulnerability and gaps.

Key references

  • Camp Management Toolkit (NRC, 2015): chapters on community participation, complaints handling, environment and safety and security.
  • Minimum Standards for Camp Management (CCCM Cluster, 2021).
  • Core Humanitarian Standard on Quality and Accountability (CHS), Commitments 4 and 5.
  • IASC commitments on accountability to affected people and protection from sexual exploitation and abuse.
  • IASC Guidelines for Integrating Gender-Based Violence Interventions in Humanitarian Action (2015), CCCM thematic area.
  • Global CCCM Cluster tools on women's participation, mobile site management and area-based approaches.
  • Collective Centre Guidelines: UNHCR and IOM (2010).
  • The Sphere Handbook (2018), Shelter and Settlement chapter (fire safety, site layout).
Scenario

Ten days to leave

Spontaneous site on private land, urban outskirts

Your role

You are your NGO's CCCM focal point for the municipality.

The owner of land where 1,900 people live posts a notice: the site must be vacated within ten days, otherwise the police will intervene. Residents are worried and some young people are talking about resisting.

  1. Decision 1 of 3What is your first action?

  2. Decision 2 of 3What do you tell residents?

  3. Decision 3 of 3Mediation secures a three-month extension. You:

Exercise: the rainy season plan

The Ngara site is located on a plain. Last year, 300 shelters were flooded and two fires destroyed 45 shelters. With the central committee (2 women out of 15 members), prepare a one-page plan: risk mapping, actions before the season, the role of committees, messages to disseminate, and measures to strengthen women's representation.

Key points

  • Representative committees, parity as the goal, limited terms, terms of reference and vigilance against capture.
  • Accessible and safe CFM; feedback loop; confidential channel for sexual exploitation and abuse.
  • Risks: firebreaks, drainage before the rains, land agreements against evictions.
  • Out of camps: mobile management and area-based approaches, benefiting both displaced people and hosts.
  • Durable solutions: return, local integration, settlement elsewhere; a free, informed and voluntary choice.

💼 Programme management jobs

Put this course into practice: the latest jobs in this field.

See all 1126 Programme management jobs →

Prepare for the written test and interviewA model written test in this field, interview questions with sample answers and the STAR method.See the model test →
Further reading: course references
  1. Norwegian Refugee Council, on behalf of the CCCM cluster (2015). Camp Management Toolkit. www.cccmcluster.org
  2. Global CCCM Cluster (2021). Minimum Standards for Camp Management. www.cccmcluster.org
  3. Sphere Association (2018). The Sphere Handbook: Humanitarian Charter and Minimum Standards (Shelter and Settlement, WASH chapters). spherestandards.org/fr/manuel-2018
  4. International Organization for Migration (2024). Displacement Tracking Matrix (DTM). dtm.iom.int
  5. Inter-Agency Standing Committee (IASC) (2010). IASC Framework on Durable Solutions for Internally Displaced Persons. interagencystandingcommittee.org
  6. United Nations High Commissioner for Refugees (2024). UNHCR Emergency Handbook. emergency.unhcr.org

Daily quiz

3 questions to check what you have learned. Answer them all to complete the day.

1A central committee has 14 men and 1 woman. The best response is to:
2A complaint of sexual abuse by a distribution worker is found in the suggestion box. You:
3The three recognised durable solutions for internally displaced persons are: